
TESCO DISTRIBUTION CENTER
The structural solution chosen was duo-pitch 4-span steel portal frames with structural cladding panels spanning column to column, without the need for secondary steel except around doors and windows.
The project is under Department's school Enhancement Initiative. The project added 10 new classrooms and a state of art Sport Hall and Drama Suite, as well as accommodation for science laboratory. There is also refurbishment and alterations to existing rooms.
You may also want to check the following projects we worked on.
The structural solution chosen was duo-pitch 4-span steel portal frames with structural cladding panels spanning column to column, without the need for secondary steel except around doors and windows.
The building is a two storey reinforced concrete frame clad in brickwork and security screens/windows.
Extension and Remodeling of the Airport Terminal, Runway Rehabilitation creating 10 new Check-Ins and the Construction of the East Access Ramp.