gradent bg
Back to all Projects

TESCO Distribution Center

The original scheme design for the distribution center was subject to rigorous value engineering exercises to establish the most economical solution at that time. The structural solution chosen was duo-pitch 4-span steel portal frames with structural cladding panels spanning column to column, without the need for secondary steel except around doors and windows. Due to the size of the building two movement joints were provided along the length within the main structure.

project image

Planning and Development

custom home

You may also like

You may also want to check the following projects we worked on.

Back to all Projects
YOUNG OFFENDER INSTITUTION

YOUNG OFFENDER INSTITUTION

The building is a two storey reinforced concrete frame clad in brickwork and security screens/windows.

LUSK
HousingView Property
LEROS AIRPORT CONSTRUCTION

LEROS AIRPORT CONSTRUCTION

Extension and Remodeling of the Airport Terminal, Runway Rehabilitation creating 10 new Check-Ins and the Construction of the East Access Ramp.

Greece
Airport TerminalView Property
THE NAVAN RING-ROAD

THE NAVAN RING-ROAD

The Navan Ring-Road was a challenging contract, Dougwell was required to build an urban inner orbital route in the second-largest town

IRELAND
Airport TerminalView Property

Let’s Build Something
Extraordinary Together

View our projects