
LEROS AIRPORT CONSTRUCTION
Extension and Remodeling of the Airport Terminal, Runway Rehabilitation creating 10 new Check-Ins and the Construction of the East Access Ramp.
The building is a two storey reinforced concrete frame clad in brickwork and security screens/windows. There is a requirement for management, installation and co-ordination of services due to the nature of the facility. The facility provides the detention center with laundry, metal works and painting booths. Dougwell's work consisted of excavation, cast in-stu piles and in-situ concrete floor slabs and columns to make up frame of building with block work infill.
You may also want to check the following projects we worked on.
Extension and Remodeling of the Airport Terminal, Runway Rehabilitation creating 10 new Check-Ins and the Construction of the East Access Ramp.
The Navan Ring-Road was a challenging contract, Dougwell was required to build an urban inner orbital route in the second-largest town
The construction project for the New Ribeira d'Água Bridge surged following the collapse of the old bridge, bearing the same name, destroyed by the intense floods of 26 September 2012.